LED Heat Sink FEATURES:
The aluminum material is melted in high temperature and become liquid status, then we pour it into the mould,. After cooling down, the product could be finished easily. We will take good care during the cooling process to avoid the bubble occurs. There's wide range of shape for Heat Sink in die-casting process.
In addition, if the quantity is huge enough, the cost would me much cheaper.
â— High structural integrity
â— Smooth die casting parts surface
â— Reduce or eliminate secondary machining operation
â— Rapid production rate
LED Heat Sink LED Heat Sink,Heat Sink,Die Casting Heat Sink,Aluminum Die Casting Heat Sink Zheke Mould Technology Co. Ltd. , https://www.zkdiecasting.com
Â
Design to close the gas heater from suddenly extinguishment.It adopts solenoid valve as a controlling components.When the gas heater extinguish suddenly in working state,this protector will power off and close the gas quickly to prevent some accidents from gas leakage,such as poisoning,fire and gas explosion etc.Design for use to control natural natural gas,coal gas and liquefiedpetroleum gas etc.
Â
Port Size:()
Male Z 1/4"×1/4"×1/8"     Â
Open valve time
≤25s
Close valve time
≤50s
Body material:()
BrassÂ
Hermeticity test
No pressure losing in 1 min under 10KPa
Â
2. Our service
We have more than 13 years experience in solenoid valves.Â
Excellent quality control is one of our main principles.Â
Our design, producing and testing are strictly complied with ISO9001 standard.Â
Now our products are being exported all over the world.Â
We provide OEM service, accept customer label, develop the product with your drawings or samples.
Any question, will be replyed within 24 hours.
Direct supplying from the factory, shorten the distance between the manufacturer and the customer.
 3. Other terms
1) About Samples
 We provide samples for your making test, you could choose UPS, DHL, EMS, FEDEX, TNT or other express company for the delivery. Tracking number will be informed you ASAP.
2) About PackingÂ
Inner packing: white box, color boxes (upon request), Outer packing: cartons or pallets
 3) Terms of payment: Â
We accept T/T, L/C, Western union, Papal
4)Terms of Shipment:
About 20-25days after receiving deposit.
5)Ports of shipment:
Ningbo/Shanghai Port, by sea or air.
6)Gurantee:Â
One year since delivery.
7)Inspection:Â
100% testing before delivery.Â
Welcome to choose our products, we are ready for you!Â
Many complicated metal components are produced by this process.