With the further advancement of meteorological services for agriculture, more and more regions have begun to use small weather stations to strengthen monitoring and early warning of the agrometeorological environment. Before the installation of a small weather station, there are two inspections that must be done. The first is the product inspection before installation of the small weather station equipment. The second is the construction inspection before installation of the small weather station equipment. The following are the two items. Check the specific content of the work. 1. Product inspection before installation of small weather station equipment 2. Construction inspection before installation of small weather station equipment Since the installation of small weather stations involves observation fields, studios, ground networks, and mains power supplies, inspections are carried out to ensure that the installation process can be carried out in an orderly manner in accordance with certain procedures. In addition, after the construction inspection and equipment acceptance are completed, the user manual and wiring diagram should be carefully read, familiar with the physical object, and then installed, and the installation work should be checked after installation. The above is a detailed explanation of the inspection work before installation of a small weather station. The installation of a small weather station is a relatively high-demand work, so it must be done by a professional installer. Generally, the equipment manufacturer will provide installation services, and the user chooses At the time, you can carefully communicate and inquire about the installation service and after-sales service to ensure that there are not many unnecessary problems in subsequent use. Commercial Ozone Generator,Air Purifier Ozone Generator,Ozone Therapy Equipment,Air Cleaner Leeyo Pilot Electric Technology Co., Ltd , https://www.leeyopilots.com
(1) Count the number of boxes;
(2) Check the products and accessories one by one according to the manufacturer's attached invoice;
(3) Check whether the product is damaged during transportation;
(4) Check the completeness of the product, especially small items (if the number of screws is sufficient, the size is consistent, etc.).
(1) Check whether the pedestal construction, cable trench construction, grounding system construction, etc. have been completed and meet the requirements;
(2) Check whether the concrete has reached the specified strength (ie, the curing time reaches 28d);
(3) Check whether the power line wiring is standardized, whether the phase, the middle, and the ground are wrong.